Effective Monday, April 3, the current Florida Mall SuperStop will be closed for construction. Six (6) new temporary boarding/alighting pads will be constructed across the street (on the southbound side of Florida Mall Ave.), as pictured below. Operators and riders are asked to use the new temporary location. Passengers will not be able to board or alight the bus within the construction zone.

Links 7, 37, 42, 107, 108, 111, FastLink 418, 441 will be rerouted as follows:
Link 7
-Continue on Golden Sky Ln.
R – Inner Mall Rd.
R – August Ln.
L – Florida Mall Ave. to new temporary transfer center
R – Sunlife Path
R – Orange Blossom Trail
R – August Ln.
L – Florida Mall Ave. and resume route
Links 37, 42, 107
-Continue on Summer Day Ln.
R – Inner Mall Rd.
R – August Ln.
L – Florida Mall Ave. to new temporary transfer center
R – Sunlife Path
R – Orange Blossom Trail
R – August Ln.
L – Florida Mall Ave. and resume route
Link 108
-Continue on Main St./Orange Blossom Trail
R – August Ln.
R – Florida Mall Ave. to new temporary transfer center
R – Sunlife Path
L – Orange Blossom Trail and resume route
(Note: Bus stop at OBT and Sunlife Path will be closed during detour)
Link 111
-Continue on Summer Day Ln.
R – Inner Mall Rd.
R – August Ln.
L – Florida Mall Ave. to new temporary transfer center
R – Sunlife Path
L – Orange Blossom Trail and resume route
(Note: Bus stop at OBT and Sunlife Path will be closed during detour)
FastLink 418
-Continue on Orange Blossom Trail
R – August Ln.
R – Florida Mall Ave. to new temporary transfer center
R – Sunlife Path
L – Orange Blossom Trail and resume route
FastLink 441
-Continue on Orange Blossom Trail
L – August Ln.
R – Florida Mall Ave. to new temporary transfer center
R – Sunlife Path
L – Orange Blossom Trail and resume route